Mid TN Electricians
For electricians

Home › Electrical Panel Upgrade

Free · No obligation

Electrical panel upgrades in Middle Tennessee.

Going from 100A to 200A, replacing a fuse box, or swapping out a problem panel? We'll match you with a licensed electrician.

  • Free, no obligation
  • Licensed local electricians
  • Usually a call within one business day
  • We follow up to make sure you were taken care of

Request an electrician

Takes about a minute.

By submitting, you agree to be contacted by one licensed electrician about this job. Free service; no spam.

You're all set.

A licensed electrician will reach out, usually within one business day. We'll check in with you in a couple of days to make sure they did.

Signs it may be time for a new panel

What a service change involves

A panel replacement or service upgrade needs a permit and inspection, and usually coordination with your electric utility to disconnect and reconnect power. Your electrician handles the permit, the utility and the inspection. Most jobs take about a day of power off.

Questions

How long does a panel upgrade take?

Most residential panel swaps are done in a day, plus time for the inspection and utility reconnect.

Do I need a permit?

Yes. Panel replacements and service changes require an electrical permit and inspection. Your electrician pulls it.

Should I upgrade to 200A?

If you're adding an EV charger, heat pump, hot tub or addition, 200A is common. An electrician can do a load calculation to confirm.

Areas & services

Licensed electricians across Madison, Nashville and Middle Tennessee.